Sustainability and Quality

Giving strategic importance on Quality and R&D are the key factors behind development of CSGlobal. In order to initiate innovative products and value added projects, CSGlobal continuously creates innovation on products, technologies and processes.

Quality Policy

Quality Certificates

Environment Policy

QUALITY

Quality is our way of life.

CSGLOBAL History

3. Micronize Değirmeni eklendi.
Başer Kırma ve Zenginleştirme Tesisi Kapasite Artışı.
Ado Morocco 3. Değirmen eklendi.
The capacity was inreased 20.7 MW more by using 9 units 2,3 MW Enercon turbines. The total installed capacity has reached 55.7 MW, with an annual production target of about 160,000 MWh.
Ado GES, which belongs to Ado Mining Company within the body of CS Group, and Yurtçim GES, which belongs to Yurt Cement Company, are working with 1 MWe installed power each. Our plants are located in Yurt Cement factory site in Küçük Buzi Kinsor location, Muş Taşoluk village. They were commissioned in August 2016. Our Solar Power Plant will generate 3.146 MWh of energy per year and reduce emission equivalent to 1,878 tons of CO2. This value corresponds to the amount of CO2 consumed by 93,900 trees per year.
Omala HEPP is located on the Yeşilırmak River in the Almus district of Tokat. The power plant operated by Adsel Energy has an installed power of 17.06 MWe. Omala HEPP, which has an annual energy generation of 55 million kWh, prevents 32.835 tons of CO2 emissions and provides a contribution equivalent of 1.641.750 tree plantings.
The capacity was inreased 4,6 MW more by using 2 units 2,3 MW Enercon turbines. The total installed capacity reached 35 MW.
Our Mining Group Companies created awareness by extending the business out of the boundaries of Turkey with company knowledge, experience, up-to-date technological methods and competent human resources in the mining sector throughout the years.

ADO Barite Morocco’s activities started raw barite trade in 2012 and continued with the production plant that was completed in 2013 in the Jorf Lasfar industrial zone, south of El Jadida, the coastal city of Morocco, with a total area of 19,930 m2. By the end of 2016, the total annual production capacity of the plant has been increased to 150,000 tons.
Ado Mining Limited Partnership is established in Antalya Free Zone and primarily engaged with Industrial Minerals trading activities. 

Ado Mining Partnership is located in Antalya Free Zone and has logistic advantages as well as having 15,000mt of indoor storage capacity.
Kozdere HEPP is located on the Alakır Stream in the Kumluca district of Antalya. The power plant operated by Yurt Energy is 671st largest power plant in Turkey and 11th in Antalya with an installed capacity of 9.27 MWe. Kozdere HEPP, which has an annual energy generation of 31 million kWh, is a renewable energy project, thus preventing 18.507 tons of CO2 emissions and providing a contribution equivalent of 925.350 tree plantings.
The company has been started to produce coal in Malkara in May 2011. First of all, the underground operation wasa rehabiliated and production was began. Then two pits were open the west of underground mine.

In 2013, The production capacity was 40 mt per hour and the plant is located 1500m2  within closed warehouse and packing unit.
Our company started to operate in the fields of transportation sector in year 2010 in Burdur/Bucak and its buniness network continiues to improve. As Efsu Transport, with the large vehicle fleet and experienced staff, we have a principle to provide the best service in a timely manner.

The company own twenty trucks; six trucks running on the direction of Antalya-Isparta, eight trucks in Tokat and six trucks running in Tekirdağ. Our vehicles have GPS tracking system.As Efsu Transport, we provide the road transport needs of group companies, mainly with most affordable and high-quality manner.
Alakır HEPP is located on the Alakır Stream in the Kumluca district of Antalya. The power plant operated by Yurt Energy is 1092nd largest power plant in Turkey and 26th in Antalya with an installed power of 2.06 MWe.  Alakır HEPP, which has an annual energy generation of 8 million kWh, prevents 4.776 tons of CO2 emissions and provides a contribution equivalent of 238.800 tree plantings.
Tocak-1 HEPP is located on the Alakır Stream in the Kumluca district of Antalya. The power plant operated by Yurt Energy is 929st largest power plant in Turkey and 20th in Antalya with an installed power of 4.76 MWe.  Tocak-1 HEPP, which has an annual energy generation of 11 million kWh, is a renewable energy project, thus preventing 6.567 tons of CO2 emissions and providing a contribution equivalent of 328.350 tree plantings.
Başer Mining was established at Şarkikaraağaç, Isparta in 1976 for conducting barite mining activities.  

The grinding plant and the enrichment plant were commisioned in 1980, and the production of oil drilling grade barite was initiated in order to supply the best quality barite to the various industries.

Başer Mining commenced micronized barium sulfate (BaSO4) production with new investments in 1998, and extended its range of products according to the market demands.

For over 40 years, Başer Mining has been supplying wide range of barite products to different sectors and more than 35 countries on 4 continents.
YURT CEMENT was established in 2008 within the borders of the Taşoluk Village of Muş province in order to meet the existing cement production needs in Eastern Anatolia with 50 years of experience of ADO Cement Group.

Yurt Cement Integrated Facilities; currently have an annual production capacity of 924,000 tons of clinker and 1,980,000 tons of cement.
Tokat integrated cement plant has an annual production capacity of 1.2 million tones of clinker and 1.8 million tones of cement.
 
A group of 173 professionals work at the plant, consisting of 134 technical and 39 administrative employees. Of the employees, 43% hold a Bachelor’s degree. In addition, the plant has 130 sub -contracted employees.

The main domestic market sales regions of the Tokat cement plant are Central and Eastern Anatolia, the Middle East, and the Black Sea region. Its’ main foreign markets are Russia, Georgia, and Ukraine.

ADOCIM set up a quality management system in 2008, and obtained TS-EN-ISO 9001 Quality Management System Certificate. Compliance with this ISO Standard ensures ADOCIM meets its’ customers’, and the entire company’s, needs, and maintains conformity with cement standards.
Barite in Turkey was first discovered in the Mus Mountains in 1945. The first barite grinding and packaging plant in Muş was established by EMAŞ in 1978, and the plant, which changed ownership a few times then incorporated into Al Mining Barite Plastics Industry and Trading Inc. Co. in 2007. The plant was eventually established with the new generation grinding technology, was put into operation at the end of 2014.

The barite production and sales activities in our new barite enrichment, grinding and packaging facility, which is located at 23. km of the Muş-Bitlis highway, continue under the Al Mining brand.
Our first commissioned project was the INTEPE WPP project which we conducted in partnership with Demirer Group, the long-established local investor in wind energy sector, in 2007 with 30.4 MW installed capacity. Later, we increased this project’s capacity to 55.7 MW and in March 2016, an additional capacity was put into commission. İNTEPE WPP is the first WPP Project that received “GOLD STANDARD CERTIFICATION” in our country and the world.
ADOCIM started producing cement in Marmara Ereğlisi in 2006.
The Marmara grinding and packaging plant is in Tekirdağ’s Marmara Ereğlisi Sultanköy district, and it has the capacity to produce 600,000 tones of cement per year. The plant’s proximity to Tekirdağ and Marmara Ereğlisi harbors creates a logistical advantage among competitors in the supply and export of raw materials. A group of 26 professionals work at the plant, consisting of 16 technical and 10 administrative employees.
ADOCIM started producing cement at Tokat integrated cement plant in 2006. The plant is located in Tokat’s Artova district.
Tokat integrated cement plant has an annual production capacity of 1.2 million tones of clinker and 1.8 million tones of cement.
Since its’ foundation, ADOCIM has maintained a professional approach on eco-friendliness, frugality, occupational and worker safety, quality control and sustainability, and continues to do so today at all its’ plants.

ADOCIM has an integrated cement plant in Tokat Artova, grinding and packaging plants in Marmara Ereğlisi, and ready-mixed concrete plants in Antalya, Tokat Artova, and Sivas.

The company entered cement manufacturing by setting up a grinding and packaging plant in Antalya in 1996.
The Antalya grinding and packaging plant is in Antalya’s Çakırlar district. It can produce 600,000 tones of cement per year, and its’ sales region encompasses the Western Mediterranean region of Turkey, from Alanya to Dalaman. A total of 24 people work at the plant, consisting of 13 technical and 11 administrative employees.
Ado Mining started to produce barite-mining activities in Isparta's Şarkikaraağaç district and producing drilling grade barite in Antalya Grinding and Packaging Facility, especially for the oil drilling industry in compliance with API / OCMA standards in 1994.

Ado Mining is one of the leading barite producer and exporter in Turkey. Ado Mining has been supplying barite with high quality products and distinguished service from the worldwide known barite deposits; with excellent processing methods and expertise, that adds value towards its customers in wide range of industries over 20 years.

Ado Mining Antalya Grinding and packaging facility has the advantage of being located 10 km. distance to Antalya Free Zone and Antalya Seaport.

Social Responsibility

As CSGlobal family, we act in an approach that is ethical, responsible, developing and protecting benefits of society and sharing what we earn from society with society in all the countries we maintain our activities. Embracing social responsibility as “corporation culture”; our group creates and initiates social responsibility projects based on the environmental and social requirements of society.

Global View

UKRAINE
GEORGIA
IRAQ
ROMANIA
ITALY
ALGERIA
LIBTA
EGYPT
NAMIBIA
CAMEROON
ARGENTINA
BRASIL
MALI
MOZAMBIQUE
UAE
KENYA
GERMANY
ANGOLA
Albania
Austria
Azerbaijan
Bahrain
Belgium
Bulgaria
Czech Republic
Denmark
Equatorial Guinea
Eritrea
Morocco
Finland
France
Gabon
Ghana
South Africa
Crotia
India
Holland
Spain
Israel
Sweden
Canada
Qatar
Kazakhstan
Cyprus
Congo
Cuba
Lebanon
Hungary
Malta
Mauritania
Nigeria
Poland
Russia
Serbia
Syria
Trinidad and Tobago
Tunisia
Turkmenistan
Oman
Yemen
Greece
Morocco